www.masstrans.com_old.png

TRANSPORTATION & INSTALLATION

Showcase

From engineering to physical execution and delivery of transportation and installation services, we have developed an extensive and flawless track record. Our summary showcase reflects the magnitude of our capabilities from a pool of compact and optimal people resources

0051.01_–_BASF-YPC_Integrated_Petrochem_
0068.01 Pg 4 MODEC Baobab Ivoirean PRM I
0094.01 – FPSO P50.png

BASF-YPC Integrated Petrochemical 

Petrochemical Reactor Loadout, Lifting & Transportation Review and Survey

Baobab Ivoirean FPSO

Topside Loadout, Transportation and Installation at Jurong Shipyard

P50 FPSO

FPSO Topside Module Installation at Maua Jurong Shipyard, Brazil

0107.01_–_Semi-Submersible_Gas_Productio
0132.01_–_PTP_IMPSA_CQC_1.png
0138.00_–_FPSO_Stybarrow_Venture_MV16.pn

Semi-Submersible Gas Production Platform “Independence Hub” 1

Pontoon and Column Uprighting and Installation at Jurong Shipyard

PTP CQC 1

IMPSA PTP CQC Upper Section Loadout & Transportation from IMPSA Lumut Yard
to Pelabuhan Tanjung Pelepas

Stybarrow FPSO

Topside and Turret Transportation & Installation at Jurong Shipyard

0151.01_&_0152.01_–_FPSO_Polvo_and_Umuro
0150.01 – P54 FPSO.png
0151.01_&_0152.01_–_FPSO_Polvo_and_Umuro

Polvo FPSO

Boiler Transportation and Installation from Mapthaphut to Polvo FPSO at Keppel Shipyyard

P54 FPSO

Topside Module Installation at Maua Jurong Shipyard, Brazil

Umuroa FPSO

Topside Loadout, Transportation and Installation at Keppel Shipyard

0180.1 Azurite FDPSO 1.png
0308.01 SMOE Gajah Baru CPP.png
0482.01 Kikeh FPSO Module 2 Installation

Azurite FDPSO

FDPSO Topside and Drilling Package Loadout, Transportation and Installation at Keppel Shipyard

Gajah Baru CPP

CPP Deck Installation at SMOE Yard, Batam

Kikeh FPSO

Topside Loadout Transportation and Installation at Kikeh Field, Offshore Sarawak

Please contact us for our extensive and detailed track record and further capabilities.